ATP 799P (Galilee 100%)
ATP 799P (40 blocks) is adjacent to and immediately north of ATP 529P.
An exploration program of two core holes was undertaken late 2009/early 2010. Results from the program have confirmed that the coals present in the Rodney Creek region extend across the exploration area into ATP 799P. Analysis of data from the two core holes drilled has confirmed gas composition and gas content levels. The results are consistent with typical results reported across the basin.
A $6 million four-year work program to be completed by Q1 2014 will be based on the intellectual property gained from exploration and analysis conducted in ATP 529P.


